• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2017 - Jul 2017
  • Estimated project cost $10,329
  • Australian Government contribution $10,329
  • Local Council/Shire Shire of Kojonup
  • State WA

Project description

Install drainage on road at various sites in low lying areas that become water logged and impassable during wet months. This will also require the road level to be raised where the drainage is being installed.

At 5 of the SLK's outlined above it is proposed to install a 300 Reinforced Concrete Pipe with a width of 7.2metres At SLK 1.46 375 Reinforced Concrete Pipe with a width of 7.2metres will be installed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.