• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2017 - Aug 2017
  • Estimated project cost $505,443
  • Australian Government contribution $505,443
  • Local Council/Shire Goulburn Mulwaree Council
  • State NSW

Project description

The existing section required new kerb and gutter with new pavement surface. Residents have been complaining for flooding and drainage problems due to water coming of the road surface which a 18.4 wide pavement.

A new geometrical design has been prepared 8m two lane carriageway plus 5.2 wide parking area along the 630 m long section. 900 m of new kerb and gutter with 5 new pits and 110 m long pipe network to cater for the currently poor drainage facilities.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.