• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Feb 2017
  • Estimated project cost $75,000
  • Australian Government contribution $24,000
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Pavement wearing surface showing signs of fatigue failure reflecting in the form of crocodile cracking and longitudinal cracking.

Profiling the existing pavement by 25 mm and resurfacing with 30 mm Stone Mastic Asphalt. Length of Road- 200 metres, Average width- 8.0 metres, Area- 1600 m2

Total cost of proposed project is $75,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.