• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2017 - Jun 2017
  • Estimated project cost $86,358
  • Australian Government contribution $86,358
  • Local Council/Shire Richmond Valley Council
  • State NSW

Project description

Failed road surface from an old and thin existing pavement that is saturated due to poor drainage and high traffic volumes due to a child care centre in the street

Install sub surface drainage on the high side of the road for the full length of the project. Improve surface drainage between driveways to existing stormwater pits. Full dig out and replacement of significantly failed section of pavement in front of Child care centre. Overlay existing pavement with road base and cement binder for additional strength and provide a bitumen seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.