• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2017 - Jun 2017
  • Estimated project cost $312,970
  • Australian Government contribution $260,140
  • State NSW

Project description

Pavement surface has been deteriorated displaying crocodile cracks in many places and also ravelling of the surface. The existing shoulder lanes are unsealed and also there is no existing kerb and gutter. The road pavement requires reconstruction and also new kerb and gutter to be installed.

Construction of kerb and gutter on both sides of the pavement, construction of shoulder lanes with 300mm DGB20 and 40mm AC10 and repair and resurface the central lanes with 40mm AC10.

Total cost of proposed project is $312,970

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.