• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2017 - Jun 2017
  • Estimated project cost $138,273
  • Australian Government contribution $125,000
  • State NSW

Project description

The road surface is old and affected by numerous cracks at trafficable lanes. Due to past treatments and current surface defects, the road surface is rough to ride on. It is also allows water to penetrate into road base causing pavement failures and surface deformations.

The proposed work includes reconstruction of trafficable lanes with asphalt and resurfacing of the road with asphalt. Length = 190 m; Width = 12 m; Area = 2280 m2.

Total cost of proposed project is $138,273

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.