• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2017 - May 2019
  • Estimated project cost $180,000
  • Australian Government contribution $180,000
  • Local Council/Shire Warrumbungle Shire Council
  • State NSW

Project description

The surface of Neilrex Road in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore, the existing surface becomes slippery during and after rainfall

The work proposed includes, the widening of the road at curves in the road, improving roadside drainage through the extension of pipe culverts and overlaying the surface with up to 300mm of compacted road base.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.