• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2017 - Sep 2017
  • Estimated project cost $125,000
  • Australian Government contribution $125,000
  • Local Council/Shire Shire of Northampton
  • State WA

Project description

Road is now a primary rural road for 27.5 metre truck combinations for cartage of farm produce within this area and is a school bus route, current condition is that road surface no longer has any suitable gravel surface to maintain the road asset, five existing culverts require widening to a width of 10 metres and replacement to improve on and off road drainage and one steep "dip" at standard linear kilometre 10.7 requires fill to lessen the steep incline a decline through dip

Gravel sheet the entire length of 5.2 kilometres, replace five culverts using concrete culvert pipes 450mm in diameter, raise road level through steep dip to reduce the incline and decline to improve road safety.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.