• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Jun 2018
  • Estimated project cost $121,000
  • Australian Government contribution $115,000
  • Local Council/Shire Central Goldfields Shire Council
  • State VIC

Project description

Luke Court is an Urban Access Road Court where the existing pattern paved concrete road 60 metres long and 3.5 metres wide with an existing three point turn around is not capable of accommodating a garbage truck and the road shoulders have deteriorated causing access and maintenance problems.

The existing concrete pavement is to be removed and replaced with a 300 mm deep pavement widened to 6 metres width with new kerb and channel both sides and an 18 metres diameter turn around area at the end with a 40mm deep asphalt surface.

Total cost of proposed project is $121,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.