• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Sep 2018
  • Estimated project cost $840,000
  • Australian Government contribution $420,000
  • Local Council/Shire South Australian Local Government Grants Commission
  • State SA

Project description

The road requires full pavement reconstruction due to it's narrow width, failed pavement and seal, and poor road and shoulder drainage. The road is a critical freight route vital to the area. The road surface suffers from heavy rutting and poor drainage. The road is in an 80km hour zone and has a large amount of interaction between heavy vehicles and commuter vehicles with the widening of the road and shoulders improving safety.

The work proposed includes widening and reconstructing both proposed sections of Swamp Road with a pavement that is suitable for long term (future projections with growth) heavy vehicle loading of adequate width and shoulders/clear zones .

Total cost of proposed project is $840,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.