Project description

The existing road pavement exhibits oxidation of the asphalt surface and areas of significant cracking and roughness. In addition significant lengths of concrete kerbing are in a poor condition.

The project includes the following major aspects - Reconstruction of 390 metres of existing road pavement, reconstruction of 860 metres of existing kerb and channel, reconstruction of existing vehicle crossings where required, reconstruction of all damaged footpath and the construction of 144 metres of underground drainage works.

Total cost of proposed project is $611,005

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.