• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2018 - Apr 2018
  • Estimated project cost $323,330
  • Australian Government contribution $323,330
  • State NSW

Project description

The existing road pavement is affected by numerous cracks and pavement deformations. The surface is old, brittle and rough. Some sections of kerb and gutters are cracked and displaced.

The proposed work includes repair of damaged sections of kerb and gutters, reconstruction of failed pavement areas and resurfacing with hot mix asphalt. Length = 324 m, Width = 12 m, Area = 3888 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.