• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2018 - May 2018
  • Estimated project cost $234,961
  • Australian Government contribution $194,051
  • State NSW

Project description

The existing road surface is affected by numerous cracks and pavement failures. The surface is old, brittle, rough and prone to development of potholes. Some sections of kerb and gutters have been cracked and displaced.

The proposed work includes repair of damaged sections of kerb and gutters, reconstruction of failed pavement areas and resurfacing with hot mix asphalt. Length = 405 m, Width = 7 m, Area = 2835 m2

Total cost of proposed project is $234,961

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.