• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2018 - Jun 2019
  • Estimated project cost $286,672
  • Australian Government contribution $286,672
  • Local Council/Shire Penrith City Council
  • State NSW

Project description

Lansdowne road was constructed approximately in 1980 to a rural standard and never been resurfaced since then. The pavement is showing of sign of failure with cracking and severe rutting due to the increased traffic volume

It is proposed to rehabilitate entire road by stabilising the existing pavement for a 1km length to a width of 7 meter with two coat seal wearing surface.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.