• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2019 - Sep 2019
  • Estimated project cost $395,000
  • Australian Government contribution $338,995
  • Local Council/Shire City of Glen Eira
  • State VIC

Project description

The road surface, pavement and kerb and channel are dilapidated condition. The road has deteriorated over the years and uneven, showing signs of failures. Extensive vehicle crossovers damage as well as scraping of road pavement, causing drainage problems. There is no sufficient drainage in the street either to drain the road surface runoff. Footpath is in poor condition.

The work involves installing new kerb and channel, reinstating failed pavement sections, providing asphalt patching to correct unevenness, asphalt resurfacing and providing adequate drainage to the street.

Total cost of proposed project is $395,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.