• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2019 - Dec 2019
  • Estimated project cost $396,014
  • Australian Government contribution $396,014
  • Local Council/Shire City of Greater Dandenong
  • State VIC

Project description

A Geotech investigation under taken for Westall Road which shows following: The existing surfacing is in poor condition. Crocodile cracks, longitudinal cracks and patches observed in Westall road. Severe settlement and differential movement for road Non engineered fill Poor bearing capacity Rutting defects Inadequate drainage that countributes to softening and weakening of the foundation.

Road Rehabilitation using deep lift asphalt. This includes replacing damaged kerbs, installation of AG drains to protect new pavement and replacement of some damaged piped drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.