This section has extensive shoulder drop offs. As the seal width is only 6 metres it is unsafe for large vehicles such as Type 1 A-Doubles and modular B-Triples to pass other vehicles. This puts a great strain on edges and leads to failures.

It is planned to clean the drains, add gravel as required on the shoulders, compacting and application of 7mm emulsion seal as required.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.