• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Apr 2020
  • Estimated project cost $89,884
  • Australian Government contribution $89,884
  • Local Council/Shire Corporation of the City of Whyalla
  • State SA

Project description

Surface has significant deterioration. Various potholes consistent across entire road segment surface. Patches from previous repair work have sagged and the existing surface is rough/rutting making it hazardous to drive on. There is also significant surface cracking evident.

Works to rectify include full width profile. Replace surface with 40mm hot mix asphalt. Some pavement patching works to be done during hot mixing. Areas of kerb and watertable to be repaired.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.