• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Apr 2020
  • Estimated project cost $138,483
  • Australian Government contribution $72,434
  • Local Council/Shire Corporation of the City of Whyalla
  • State SA

Project description

Rutting evident on surface, various areas with patching. Issues with cross fall for water drainage - this area appears to have been patched various times, likely water damage to road. Cracking of top surface evident.

Repair road using full width area profiling. Replace with 40mm hot mix. Water table and kerbing repairs in isolated areas. Road profile needs to consider water run off.

Total cost of proposed project is $138,483

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.