• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2019 - May 2020
  • Estimated project cost $450,000
  • Australian Government contribution $10,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road has significant rutting, has many edge breaks due to the narrow sealed width, potholes form regularly and cross falls are incorrect in a number of locations.

Remove vegetation that is within the required pavement construction width. Reconstruct the road so that the pavement width is 8 metres and the sealed width is 6 metres. Replace failing storm water culvert. Place a new seal and guideposts as required.

Total cost of proposed project is $450,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.