• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2019 - May 2020
  • Estimated project cost $129,269
  • Australian Government contribution $129,269
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Various sections of the existing road have significant rutting and/or surface failures causing a very uneven road surface. Other sections of the sealed surface have cracking.

Import gravel to add 50 milimetre of material over four sections of the road, undertake cement stabilisation and reform those sections with a 2 percent crossfall. Apply a two coat spray seal to these sections and a single coat spray seal to the sections of road that were not reformed. Replace centre and edge line marking.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.