• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Jun 2021
  • Estimated project cost $31,285
  • Australian Government contribution $31,285
  • State NT

Project description

1. Short cutting from East Road (goes past the community hall) to the back of houses that run along Wudanbaiya Road and to open area between Lots 255 and 254 on Wudanbaiya Road. Also driving across the foot/bike path to go to these Lots. 2. Vehicles driving too fast past the entrance to the community hall where there is often children/youth and adults around.

1. Install 34 bollards from intersection of Wake Road and East Road to the corner of the community hall fence line. Leave drive way clear for Larrakia Night Patrol to enter Lot 250 and Residents of the flats at lot 249 to enter. 2. Install speed humps approx 6m before the speed humps near the corner of East Road and Wake Road. 3. Erect signage at intersection of East road and Wake road - Give Way signs, hump signs, 40km signs - signs previously placed there to be replaced due to vandalism. 4. Erect signage x 2 and speed hump at the corner of community hall fence advising of speed hump before the hall gate 5. Erect signage x 2 and speed hump on east road between the second fence gate at the community hall (lot 245) and the corner of East Road and the road that runs done the side of the community hall (lot 245) 6. Erect signage of 40km and kids/bikes/pedestrians signage at the corner of East road facing the Wake Road and East Road intersection.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.