• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2019 - Jun 2020
  • Estimated project cost $857,124
  • Australian Government contribution $785,619
  • Local Council/Shire Shire of Meekatharra
  • State WA

Project description

The road has become corrugated over time and is also water worn. This has resulted in loss of road surface material. In addition, the 5 floodways in this section of road, wash out badly on each rain event. Sealing this section will provide a safe dust free overtaking section in a heavy vehicle usage area.

Reconstruct road to 10 m wide, improve drainage and apply a 7.2 m wide bitumen seal over a length of 8 kms.

Total cost of proposed project is $857,124

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.