• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2019 - Oct 2019
  • Estimated project cost $70,000
  • Australian Government contribution $70,000
  • Local Council/Shire Mosman Municipal Council
  • State NSW

Project description

A section of concrete pavement slabs have failed by severe cracking and deflecting with heavy vehicles driving over it. Approximately 50mm settlement between joints. Sink hole on kerb and gutter. This is the upper level of roadway supported by a retaining wall dividing lower and upper level of Bay Street.

Renewal of concrete road pavement. Remove sections of failed concrete panels and replace sections of kerb and gutter that has broken and sunken into sink hole.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.