• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2019 - Apr 2020
  • Estimated project cost $136,557
  • Australian Government contribution $136,557
  • State WA

Project description

The current 4.0 meter wide road surface is too narrow for the safe passing of heavy vehicles.

Widen existing 4.0 metre wide seal to a 7.0 meter wide seal for a distance of 740 metres. Widen three 7.0 metre sections of the existing road carriageway to a 10 meter carriageway. New gravel will be imported, spread, water bound and compacted to achieve the designated surface.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.