• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2020 - Jun 2020
  • Estimated project cost $99,230
  • Australian Government contribution $99,230
  • Local Council/Shire Uralla Shire Council
  • State NSW

Project description

The existing single lane bitumen road (3 metres wide) has a very low strength pavement, high shoulder on one side, poor drainage, resulting in pavement failures and reduced road safety for road users.

Pavement design, reconstruction and stabilisation of the existing single lane formation, pavement widening to 6 metres, additional of base course gravel and single lane bitumen seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.