• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Jun 2020
  • Estimated project cost $653,287
  • Australian Government contribution $110,000
  • Local Council/Shire Golden Plains Shire Council
  • State VIC

Project description

The bridge is showing signs of structural distress in spans 1 and 3. This is displayed by structural cracking longitudinally along the U-slab units near the junction of the legs and the deck elements of each individual unit. It is estimated from observations that 40% of the existing U-slabs in both spans 1 & 3 are exhibiting these issues.

Deck replacement and construction of a retaining wall to improve retention of approach fill and issues with scouring. The existing and non-conforming bridge barrier will be removed and upgraded to a VicRoads approved medium performance bridge barrier with approach railing consisting of w-beam barrier to the bridge railing.

Total cost of proposed project is $653,287

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.