• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2020 - Jun 2020
  • Estimated project cost $70,590
  • Australian Government contribution $70,590
  • Local Council/Shire Golden Plains Shire Council
  • State VIC

Project description

20 tonne load limited bridge requires replacement. A level 2 inspection of the structure was completed in September 2018 identifying spalling to the majority of the pier bracing members across the structure, significant corrosion to steel components including railing, girders/stringers and deck.

To facilitate this replacement - survey, geo-technical investigation, hydraulic analysis and detail design is required to be undertaken in preparation for competitive tendering.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.