• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2019 - Dec 2019
  • Estimated project cost $117,325
  • Australian Government contribution $117,325
  • Local Council/Shire City of South Perth
  • State WA

Project description

Pavement cracking, patch failure, depression and defects; Cracked and non-uniform kerb types; Damaged drainage pit; and Cracked and not up to standard kerb ramps.

It is proposed to mill out most of the existing road surface by 35mm, lay 20mm low void black Stone Mastic asphalt then 25mm Dense Graded Asphalt to improve road pavement conditions. Mill and lay red asphalt on the thresholds of Cornish Crescent. Reinstall and upgrade kerbing. Upgrade kerb ramps to the current standard. Upgrade a damaged drainage pit and Reinstall pavement marking.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.