• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2019 - Sep 2020
  • Estimated project cost $220,756
  • Australian Government contribution $220,756
  • Local Council/Shire Cabonne Shire Council
  • State NSW

Project description

Gravel road, generating lots of dust. Sharp bends resulting poor sight distance. Pavement degradation. Narrow road (4.1mts)

Full seal of gravel road. Redefining drains with excavation and grade. Widening/ overlay 100mm, and stabilising road (if required) to an 7m formation with a 7m seal for 1.61 km. Widen culverts/ new culverts where required. Vegetation including tree removal and branch removal to improve sight distance on the road corridor.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.