• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2019 - Dec 2019
  • Estimated project cost $250,000
  • Australian Government contribution $70,000
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Fatigue failure of the road pavement surface reflecting in the form of longitudinal structural cracks.

Profiling and resurfacing section of Nicholson Road with 10mm aggregate size Stone Mastic Asphalt (30mm thickness). Total length-603 metres. Average width-8.70metre , Total area- 5246 m2

Total cost of proposed project is $250,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.