• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Apr 2020
  • Estimated project cost $199,608
  • Australian Government contribution $199,608
  • State NSW

Project description

The existing surface is old, oxidised, rough and prone to development of potholes. It has been affected by numerous pavement failures, previous patching and cracks.

The proposed work includes repair of failed pavement areas by patching and resurfacing of the road with asphalt. Length = 350 m; Width = 10 m; Area = 3500 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.