• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2019 - Dec 2021
  • Estimated project cost $325,367
  • Australian Government contribution $325,367
  • Local Council/Shire Balranald Shire Council
  • State NSW

Project description

Formation of road has deteriorated due to traffic. The road level is below natural surface making it impassable in wet conditions. Road side drainage is none existent causing deep scouring along side of the road and certain places crossing the road.

To form and build the road up to natural surface with natural material. Installation of drainage pipes, gravel construction 8m wide for a length of 2m. Bitumen spray seal and 10mm aggregate spread. This will include grading along the sides of the road to form table drains for drainage flow.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.