• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2019 - Dec 2019
  • Estimated project cost $123,407
  • Australian Government contribution $123,407
  • Local Council/Shire Wellington Shire Council
  • State VIC

Project description

Existing 3.8m wide road currently in deteriorated conditions with sub-standard vertical curve design presenting safety issues.

Reconstruction and widen 550m section of road to 6.8m including additional 150mm of pavement and sealing. Widening, shoulder reconstruction, drainage and signage works are required. Application of 7mm bituminous seal at 6.2m wide.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.