• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Jun 2020
  • Estimated project cost $118,077
  • Australian Government contribution $118,077
  • Local Council/Shire Weddin Shire Council
  • State NSW

Project description

The twin cell Box culvert is beyond its service life and severely damaged requiring to be replaced immediately otherwise chance of collapse. The new culvert will be rated to B-double rated vehicles.

Stage One works proposed are: - Install side track - Demolish and dispose the existing culvert, - Excavate down to the required depth for the new base slab, including a 250 mm gravel base, - Construct base slab, - Install box cells and headwalls, - Construct deck slab, - Construct road to tie into new deck - Install guard rail over the length of culvert - Seal road comprising of 14mm/7mm seal - Remove side track.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.