• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Aug 2022
  • Estimated project cost $2,047,751
  • Australian Government contribution $628,563
  • Local Council/Shire Balranald Shire Council
  • State NSW

Project description

Formation of road has deteriorated due to increase of heavy vehicles traffic. The road level is below natural surface making it impassable in wet conditions. Roadside drainage is none existent causing deep scouring alongside of the road and certain places crossing the road.

To form and build the road up to natural surface with natural material. Installation of drainage pipes, gravel construction 8m wide for a length of 12.4km. Bitumen spray seal and 10mm aggregate spread at a width of 7m. This will include grading along the sides of the road to form table drains for drainage flow.

Total cost of proposed project is $2,047,751

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.