• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2020 - May 2021
  • Estimated project cost $299,308
  • Australian Government contribution $299,308
  • Local Council/Shire Shire of Strathbogie
  • State VIC

Project description

The condition of the Galvanised steel structure has deteriorated to a point where the carrying load limit has been reduced from standard.

Major Culvert No. 349 . It is proposed to that it be replaced with a twin cell Rubber Rin Jointed reinforced concrete pipe structure with headwalls on up and down stream ends as well as rock beaching and geotextile fabric which will restore the carrying capacity to standard.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.