• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Dec 2021
  • Estimated project cost $1,270,500
  • Australian Government contribution $635,000
  • Local Council/Shire Upper Hunter Shire Council
  • State NSW

Project description

Poor stormwater drainage and road with restrictions. Narrow low strength pavement.

It is proposed to replace damaged stormwater pipes/culverts with larger size pipe. Pavement widening to 9 metre formation. Gravel overlay (200mm) to strengthen pavement and construct auxiliary lane

Total cost of proposed project is $1,270,500

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.