• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2020 - Jun 2020
  • Estimated project cost $373,097
  • Australian Government contribution $345,000
  • State NSW

Project description

Existing road surface is uneven with failures requiring reconstruction. Existing kerb and gutter is uneven with surface water pooling for extended periods of time.

Reconstruction of the exiting road including strengthening the existing sub-base through stabilization, constructing a new base course pavement, sealing the road, reconstructing the kerb and gutter to fall to the underground stormwater system and installation of additional underground stormwater to assist with road drainage.

Total cost of proposed project is $373,097

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.