• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - May 2020
  • Estimated project cost $258,009
  • Australian Government contribution $136,585
  • State NSW

Project description

Existing road surface is uneven with failures requiring reconstruction. Existing kerb and gutter is uneven with surface water pooling for extended periods of time.

Reconstruct the road shoulder on either side of Cressy Street including strengthening the existing sub-base through stabilisation and constructing a new base course pavement. Resealing the entire width of Cressy Street, including the reconstructed shoulders and existing travel lanes. Reconstruct the existing kerb and gutter along both sides of Cressy Street

Total cost of proposed project is $258,009

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.