• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2020 - Jul 2020
  • Estimated project cost $83,024
  • Australian Government contribution $83,024
  • State NSW

Project description

The existing road surface is affected by various types of cracks. Pavement failures are predominant along northern road shoulder. The existing surface is old, oxidised and prone to development of potholes.

The proposed work will include replacement of existing pavement failures by heavy patching and resurfacing of the road with asphalt. Length = 275 m; Width = 11.6 m; Area = 3190 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.