• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2020 - Dec 2020
  • Estimated project cost $749,975
  • Australian Government contribution $300,000
  • State NSW

Project description

This is the last section of Delegate Road that needs to be sealed between Delegate and the Victorian boarder. The objective is to reduce to risk to local road users, traveling public and local forestry industry, by improving the horizontal and vertical alignment, reducing future pavement failures and increasing the formation width.

Widen formation to meet Australian Standards Realign approximately 200m of road Install New Culvert - 750mm Repair existing 450mm Culvert Place 300mm pavement layer Place 10mm Primer seal Place 8m wide seal Line mark to 3.5m lane width

Total cost of proposed project is $749,975

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.