• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - Jun 2021
  • Estimated project cost $14,170
  • Australian Government contribution $14,170
  • Local Council/Shire Wangaratta Rural City Council
  • State VIC

Project description

Road pavement is in poor condition due to frequent flooding as a result of the Southern (upstream) table drain being blocked.

Reshape existing drain to redirect overland water flow and improve capture. Remove existing pavement and sub base and replace with approximately 170m2 of pavement.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.