• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - Nov 2020
  • Estimated project cost $66,147
  • Australian Government contribution $66,147
  • Local Council/Shire South Gippsland Shire Council
  • State VIC

Project description

Gravel roadway is low and constantly floods during winter and spring from nearby creek resulting in material loss on roadway and high maintenance upkeep

It is propose to reconstruct a 100 meter section of gravel road into a low level floodway with concrete edge strips and a 40 millimeter asphalt surface with flood marker indicators to prevent road from washing away during floods.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.