• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - Apr 2021
  • Estimated project cost $96,719
  • Australian Government contribution $48,000
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Fatigue failure of the pavement reflecting in the form of structural longitudinal cracks on asphalt wearing surface.

Profile the existing pavement to a depth of 25mm and resurfacing with 30 mm SMA. Length- 300 metres, width of pavement-7.8 metres, Total area--2340m2

Total cost of proposed project is $96,719

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.