• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2021 - Mar 2021
  • Estimated project cost $67,500
  • Australian Government contribution $32,500
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Pavement failure reflecting in the form of wide structural longitudinal cracking on asphalt wearing surface.

Profiling the existing pavement to a depth of 25mm and replacing it with 30 mm thick crumb rubber 10mm aggregate size dense graded asphalt. Length- 130 metres, Width- 6.5 metres, Total area- 845m2.

Total cost of proposed project is $67,500

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.