• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - May 2021
  • Estimated project cost $450,000
  • Australian Government contribution $121,924
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road has significant rutting, edge break and sections with poor cross fall, seal stripping and pot holes occur regularly. Table drains are minimal and do not exist in some sections.

Replace one culvert that is failing. Form table drains to accepted standards. Rip the road and import gravel; form gravel to the required shape of the road and place a 7 metre wide seal with a 1 metre unsealed shoulder each side. Place signs and guide posts as required.

Total cost of proposed project is $450,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.