• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Aug 2023 - Jun 2024
  • Estimated project cost $291,238
  • Australian Government contribution $291,238
  • Local Council/Shire Shire of Mount Magnet
  • State WA

Project description

The Western side of Watson St is subject to flooding and water lying on the surface of the pavement for long periods following rain events. Water levels anecdotally encroach on property boundaries. This is due to a lack of drainage and sags at crossovers between medians.

Undertake Survey of Watson St and profile existing surface and re-level to achieve a free draining surface. Reseal affected areas. Removal and reconstruction of kerbing. Construction of drains to Baramia Creek.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.