• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2020 - Jun 2021
  • Estimated project cost $408,539
  • Australian Government contribution $408,539
  • Local Council/Shire Uralla Shire Council
  • State NSW

Project description

The existing two ways and two lanes (6 metres wide) has very low pavement strength, showing distress, edge breaks and crackings.

Reconstruction includes heavy patching of existing formation, pavement widening to 8 metres, additional base course and bitumen seal to 7 metres including stormwater drainage improvement.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.