• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - Jun 2023
  • Estimated project cost $411,163
  • Australian Government contribution $411,163
  • Local Council/Shire Upper Lachlan Shire Council
  • State NSW

Project description

The condition of pavement is very poor with a formation of corrugation, rutting, edge drop and loss of crown including the longitudinal and transverse cracking of the sealing surface.

It is proposed to rectify the problems of road pavement by overlaying the gravel over the existing pavement and spraying the bitumen pray sealing and constructing the table drains. This process will increase the pavement thickness and widen the road by shoulder widening and rectify the edge drops.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.